Update on pool phangnga Thailand

Well the rain has not gone however yesterday was dry and clear, today little rain so there has been progress on the pool.

Finished the concrete and now installing the liner
IMG_4237.JPG

It should be completely finished within a few more days, we were given a 10 day build time, but have lost 4 days due to the weather, it's day 15 today so pretty much on target, can't wait to share a cold beer with the wife while sitting in the pool, it's her birthday at the end of the month so fingers crossed.

Once the pool is done the view as you enter the bungalow should be what we planned it would be, line of sight directly through, then it's just the rest of the garden, from the rear terrace there will be two maybe three steps down which will be one meter width creating different levels to put pots/plants on and this should fit it to the lower terrace which there will be a covered seating area, outside toilet and shower and a outside Thai kitchen.

IMG_4244.JPGIMG_4189.JPG

Stay safe steemits

6 upvotes $0.02

Replies (1)

Review before signing

Posting as . Signing with . Keychain permission: Posting. Hive Keychain will ask you to approve this action next.


  
Technical details

Operation fingerprint: