4th Street Bar Hive-Bar

Hive-Bar Powered by Hive beta-fdb5b5b

Community post

Cross - Section

in planning a road the first thing to do is to repair the ground for the shoulder of the road so that the CBR is needed, the way is to dig the shoulder of the road.
galian.JPG

then make a pile on the excavation
URPIL.JPG

after that did a stretch of base B
lpb.JPG

after that did a stretch of base A
lpa.JPG

after the stage has been passed then the next is pavingAC BC.JPG

3 upvotes $0.00

Replies (2)

Review before signing

Posting as . Signing with . Keychain permission: Posting. Hive Keychain will ask you to approve this action next.


  
Technical details

Operation fingerprint: